What are the precautions in the parking line planning process?
- Jul 06, 2018 -

1. Hot melt coating laying


In order to ensure the quality of the parking lot line construction, the construction team uses mechanical melting and artificial hand-draw lines, and also with the surface glass beads, when marking arrows and text, not only remember to stick tape on the side line, Also pay attention to work according to the thickness required by different markings to ensure the visual effect of rainy days or foggy days. It is also necessary to pay special attention to the fact that the staff should pay special attention to keep the road surface clean during construction.


2. Sample line and sweeping the road


Another work in the parking lot marking construction is to draw water-based paint samples, the purpose is not only to save time, accurate positioning, but also to improve the accuracy of the line shape to improve its accuracy, in addition, Workers also need to use a brush or other tools to remove dust, moisture, oil and other ground attachments, especially the clarity of the water, it is necessary to ensure the road surface is dry.


3. Stakeout


The lofting work should be carried out by the professional lofting team among the excellent parking lot scribing constructors. The main responsibility is to accurately calculate the important parts such as road curve segments, arrows, intersection triangle ends and island tails, and carefully stake out. The staff should accurately check the lane boundary line and the set center line position. In order to facilitate the spraying work, draw the center line sample line and draw the outline of the line width.

2.jpg